Monday, April 11, 2011

MPMonday Checklist Check-In

Just a quick check-in on our list--

Main Bath

  • Order vanity top
  • Seal floor
  • Install base tile:  Installed!  I do still need to grout and seal this, though.
  • Install vanity/sink/faucet: DONE!  Finally, after three trips from the new plumber and one extra trip from the marble guy to re-do the drain opening, everything is attached and working!  I do still need to seal the top, but will do that when I seal the baseboard.
  • Install new shower curtain rod
  • Buy/install new switchplate covers
  • Put up shelves/artwork
  • Trim and install door: Hinges are installed on the door frame, but the door still needs more trimming to hang and swing correctly before it can be installed.
  • Buy and install mirror